Min/Max inventory is a replenishment rule with two settings: Min, the stock position that triggers an order, and Max, the position to reach by ordering. With Min = 40 and Max = 90, a position of 35 triggers a purchase of 55 units. A position of 45 triggers nothing, although it is below Max.

Once Min and Max are set, an ERP can generate orders unattended. Choosing values that lead to worthwhile purchases is harder: it requires forecasts, costs, and a comparison with other uses of cash. If planners must revise thousands of thresholds by hand, the purchasing judgment remains manual.

How the calculation works

Let \(P\) be inventory position: usable stock on hand, plus stock already on order, minus backorders. The reorder-point guide explains how sales, orders, and receipts affect this quantity. In the usual notation, Min is \(s\) and Max is \(S\). Using a trigger that includes equality:

\[ q(P)=\begin{cases}S-P & P\leq s\\0 & P>s\end{cases} \]

Here, \(q\) is the quantity to order and \(S\geq s\). Some systems trigger strictly below Min instead. Check that boundary before applying the formula to an ERP.

From left to right, position starts at 45. A sale of 10 takes it below Min 40 to 35. Ordering 55 then raises position to Max 90.

A. Time runs left to right; height is inventory position P. At step 0, position is 45 and no order is needed. The sale at step 1 takes it to 35, below Min. The purchase of 55 at step 2 brings it to Max = 90. The vertical rise records the order, not the arrival of goods. Steps show sequence, not elapsed time.

A customer can take stock below Min in one transaction. This undershoot is why the order quantity is Max minus the current position: 55 units at a position of 35, compared with 50 at a position of 40. The gap between the two settings is neither a fixed lot size nor necessarily an economic order quantity.

Nor do the names describe bounds on physical stock. Min is not a guaranteed floor: stock continues to fall while a delivery is in transit. Max is not a storage ceiling: it targets position after ordering, not stock on the shelf after arrival. If the calculated purchase of 55 must be rounded to cartons of 12, the order becomes 60 and position reaches 95. The supplier’s lot requirement has already taken it above Max.

Choosing two numbers is the difficult part

One common recipe sets Min to expected demand during lead time plus safety stock, then sets Max higher to reduce ordering frequency. This imports the assumptions of the safety-stock calculation and the chosen lot-sizing rule. It does not establish that the resulting purchases earn an adequate return.

A Min/Max policy can use probabilistic forecasts. But a probability target does not price the consequences of a shortage or of surplus stock. The service-level discussion explains how those costs enter the choice of a quantile. Even economically calibrated settings for individual products can compete for the same cash, truck, or warehouse space.

The period being covered also depends on when another order can be placed. If orders are reviewed every Monday and delivery takes three days, a periodic order-up-to target must cover the seven-day review interval plus those three days: ten days of demand. A quantile for only three days answers a different question. Setting Min equal to Max gives an order-up-to rule at each review; it does not turn the lead-time quantile into the right target automatically.

That ten-day calculation assumes a fixed lead time and the simple periodic policy. With uncertain deliveries, follow the outstanding orders and their possible arrival dates. A supplier that sometimes ships from stock and sometimes waits for production needs a lead-time distribution, not just an average. A late shipment can leave shelves empty despite a position above Min; a subsequent arrival can make a second purchase redundant.

The settings keep buying until someone changes them

Consider a product nearing the end of its season. Its position falls from 11 to 8, crossing Min = 10. With Max = 30, the system orders 22 more units. If the remaining season is unlikely to exhaust the eight already available, that purchase mostly creates stock for clearance or disposal.

These settings continue replenishing a product that is being phased out. Lowering both thresholds can stop the purchase, but someone—or another calculation—has to recognize the change first. Recomputing both values from a trailing sales average can keep the orders coming as demand disappears.

The same maintenance problem occurs with promotions, assortment changes, supplier failures, and expiring stock. Counting the time spent creating purchase orders misses the work spent repairing their inputs. Measure the time spent reviewing parameters, correcting proposals, and handling the resulting surplus and shortages. A policy that needs daily SKU-by-SKU intervention has automated only part of the job.

A supplier minimum applies to the whole order

A supplier requires an order worth at least $400. Products A and B cost $10 per unit and come in cartons of ten. The buyer has $400 available. Min/Max requests ten units of each product: a $200 order that the supplier will reject.

Doubling both lines meets the supplier minimum. To assess the purchase, suppose the extra stock can arrive before a single selling period. Demand remaining after existing stock is used has the following distribution:

Product Demand for additional units Selling price per unit
A 0 with probability 80%; 20 with probability 20% $25
B 20 with probability 20%; 40 with probability 80% $20

Unsold units have no residual value; there are no further costs or receipts. With 20 units of each, A sells four units on average and B sells twenty. Expected revenue is $500, leaving $100 after the $400 purchase. Buying forty B units instead yields 36 expected sales, $720 in revenue, and $320 after purchase.

Five purchases costing 400 each allocate four cartons between A and B. Expected profit rises from minus 300 for all A to plus 320 for all B. Splitting the purchase equally earns only 100.

B. Each small box is a ten-unit carton: blue for A, green for B. Every row costs 400 and satisfies the supplier minimum. Bars on the right show expected profit after purchase cost. Buying nothing earns zero in this example. Losing and profitable orders pass the same constraint check.

These are all five purchases allowed by the budget, carton size, and supplier minimum. Merely topping up the two triggered lines misses the best one. A constraint check can reject an invalid order; it cannot choose which products deserve the extra units. The calculation must compare feasible purchases with each other and with waiting. Larger assortments add more combinations, and waiting changes the demand and supply risks to be considered.

Where the simple rule earns its keep

For inexpensive, durable supplies with modest financial stakes, a rough Min/Max rule can save more administrative work than a refined calculation would save in stock. That tradeoff changes with obsolescence, costly shortages, or shared transport limits.

Transferring stock from a reserve location to a picking bin is also a different decision from buying more stock for the company. A bin threshold can trigger a short internal move. Purchasing from a supplier commits money, adds incoming inventory, and may expose the company to months of unsold stock. The same two fields can conceal very different consequences.

Using Min/Max fields to execute a calculated purchase

An ERP need not be replaced merely because its replenishment screen uses Min/Max. A separate system can calculate the purchases, then use those fields to make the ERP emit the corresponding orders. The fields become an execution interface; they no longer decide what deserves to be bought.

Suppose a calculation selects a purchase of 20 units and the ERP reports a position of 35. Setting Min and Max to 55 makes the simple rule order 20. This works only if the ERP still uses that position when it calculates the proposal, accepts equal settings, and applies no quantity modifier that changes the result.

A planned purchase of 20 at position 35 is encoded as Min and Max both equal to 55. If position is still 35, the ERP orders 20. If five units have since sold, position is 30 and it orders 25.

C. Two alternative execution times for the same requested purchase of 20. Executing at 10:00 would produce the intended order. If execution waits until 10:05 and five units sell meanwhile, the unchanged settings produce 25. No purchase has been placed in between. The extra five may or may not be worth buying; the field update alone has not evaluated them.

Use a dated stock snapshot and a defined execution time. Before releasing a proposal, compare its supplier, destination, quantity, and requested delivery date with the intended purchase. If the ERP uses newer stock data, reconcile the difference or recalculate the decision. Rounding, approval delays, and date cutoffs also affect the result. A proposal not yet counted as incoming stock can be generated again on the next run.

Zero is not a universal off switch. If the trigger includes equality, Min = 0 still triggers at a position of zero. A negative position can trigger even with Min = −1. Zeroing both fields can therefore create a purchase to clear a backlog. Use the ERP’s explicit replenishment suspension when available; otherwise verify a suppression method against its actual rules. Retire temporary settings after execution so they do not keep buying against an obsolete decision.

Where the ERP accepts purchase proposals directly, that interface can carry the intended quantities without converting them into thresholds. Min/Max fields remain a useful integration option when their behavior has been checked. They cannot, on their own, specify every supplier, delivery date, transfer, cancellation, or allocation that a purchasing calculation may select.

Moving beyond parameter maintenance

Lokad’s approach is to calculate purchases from probabilistic demand and supply forecasts, economic consequences, and shared constraints. Supply chain scientists maintain that calculation as products, suppliers, and business priorities change. The daily output is a set of decisions that can be executed; planners should not have to translate it back into thousands of threshold adjustments by hand.

During a transition, run the calculation beside the existing policy. Examine disagreements: a product below Min that should not be reordered, a worthwhile purchase above Min, or a supplier order that should be delayed or regrouped. Trace each difference to the demand, delivery, cost, or constraint that produced it. Count the intervention needed to make the orders usable as well as their financial results.

The reorder-point guide and its Excel examples cover the underlying stock arithmetic. The discussion of the Min/Max approach develops the critique of treating each SKU as an independent purchasing problem.