Contact us
Back to knowledgebase

Reorder Point

A reorder point is an inventory threshold that triggers a replenishment order. A rule might say: when the inventory position falls to 40 units or below, order 50 units. The threshold answers when to order. A separate rule answers how much.

An ERP can apply this rule with a few fields. Choosing the purchase requires more: whether to pay for faster delivery, which products deserve the remaining cash, and whether the supplier’s minimum order is worth buying. A stock threshold leaves these questions unanswered.

Compare the threshold with the right stock quantity

The usual comparison is with inventory position, not just the units on the shelf. In a simple system with backorders:

\[ P=H+O-B \]

Here, \(H\) is usable on-hand stock, \(O\) is stock ordered but not yet received, and \(B\) is the quantity still owed to customers. Stock awaiting inspection is not usable. Count reservations once: subtracting a reservation already deducted from available stock counts the same obligation twice. A lost sale creates no obligation to ship later.

Consider 40 units on hand and 30 on order, with no backorders. Inventory position is 70. A customer takes 35 units: on-hand stock falls to 5 and inventory position to 35. A reorder point of 40 now triggers an order of 50. Position rises immediately to 85, while on-hand stock remains 5. Receiving the earlier 30-unit shipment later raises on-hand stock to 35; inventory position stays at 85.

A sale reduces inventory position from 70 to 35. Ordering 50 raises it to 85 without adding stock on hand. Receiving an earlier shipment changes on-hand stock but leaves inventory position at 85.

A. Read left to right. Blue is usable stock on hand (H); pale green is stock on order (O). The stacked columns give position P; there are no backorders here. Sale 1 takes P below the dashed reorder point r = 40. Order 2 adds 50 to O. Receipt 3 moves 30 from O to H without changing P. Rechecking only H after ordering would invite a duplicate purchase.

ERP conventions differ. Check how purchase proposals, approved orders, partial receipts, and cancellations affect the reported position. Counting an unapproved proposal as incoming stock can postpone a needed purchase.

The trigger does not determine the quantity

Two common ordering rules are:

Policy Trigger Quantity ordered
Fixed lot, (r, Q) Position reaches or falls below r Q, a preset lot
Min/Max, (s, S) Position reaches or falls below s S minus current position

At a position of 35, a fixed lot of 50 raises position to 85. A Min/Max policy with Min = 40 and Max = 90 orders 55, not Max − Min = 50. The difference is the undershoot: demand has carried stock past the trigger before an order is placed. A large customer order can cause undershoot even when every transaction is processed immediately.

Case packs, minimum order quantities, and discounts also affect the quantity. A supplier may require 100 units when only a few are needed. Compare buying that lot with waiting, using another supplier, or spending the money elsewhere. The economic order quantity provides a lot size under specific assumptions about demand and costs; it does not settle these choices.

When a reorder point is a demand quantile

Suppose stock reaches the trigger exactly, no earlier orders remain outstanding, and the remaining stock must last until the new order arrives. Let \(X\) be demand over that lead time. The smallest integer threshold covering demand with probability at least \(p\) is:

\[ r_p=\min\{n\in\mathbb{Z}_{\geq0}:\Pr(X\leq n)\geq p\} \]

This is a quantile of lead demand. Under these assumptions, \(p\) is the target cycle service level. It says nothing about the cost of carrying the extra stock. A 95% cycle service level means 95% of cycles avoid a shortage; it does not mean 95% of units are supplied, or one stockout day in twenty. See service level and fill rate.

Suppose four joint demand-and-delivery scenarios are possible:

Lead time Demand before arrival Probability Cumulative probability by demand
2 days 6 units 40% 40%
2 days 10 units 30% 70%
7 days 21 units 10% 80%
7 days 35 units 20% 100%

Mean lead demand is 14.5 units. A 70% target selects 10 units; a 90% target selects 35. Demand never exceeds 35 in these four scenarios, so the latter achieves 100% coverage. The jump comes from the late deliveries. The mean alone does not reveal how much stock those deliveries require.

Four lead-demand outcomes have probabilities 40, 30, 10, and 20 percent. Cumulative probability reaches 70 percent at 10 units and first exceeds 90 percent at 35 units.

B. The upper bars show the four scenarios; calendar icons indicate their lead times in days. The lower staircase accumulates their probabilities. Moving the target from 70% to 90% jumps across the gap between the two-day and seven-day delivery outcomes. These probabilities are illustrative, not recommended service targets.

Demand arrives in integer quantities, sometimes in large customer orders. Lead times can have distinct short and long modes: the supplier either has stock or must replenish it first. Demand and delays can also rise together during a market shortage. A normal approximation smooths away these features. Estimate demand together with the time until stock becomes usable, including any dependence between the two.

The ordering calendar matters too. With an opportunity to order every seven days and a fixed three-day lead time, a conventional periodic order-up-to policy covers demand over ten days. Calculating stock for three days misses the wait before the next order. Running the software daily does not create a daily purchasing opportunity if the supplier accepts orders only on Mondays.

Incoming stock has an arrival date

Two stores each have 12 units on hand, 20 on order, no backorders, and demand of four units per day. Both report an inventory position of 32. At the first store, the shipment becomes usable at the start of June 3. At the second, it arrives at the start of June 8. Starting on June 1, the second store runs out after three days and accumulates 16 backorders before the receipt. The first avoids a shortage throughout that interval.

Both stores start with an inventory position of 32. A June 3 receipt prevents shortages; a June 8 receipt leaves four days of unmet demand, totaling 16 backorders before arrival.

C. Each line shows usable stock minus backorders. Demand is booked at the end of each day; receipts become usable at the start. Both shipments contain 20 units. The shaded area marks the backlog before the June 8 receipt: 16 units are owed to customers just before it arrives.

Here, customers wait for their orders. If they walk away instead, those 16 units become lost sales. The late receipt then leaves 20 units on hand, with no backorders to clear. Customer behavior changes both the cost of the shortage and the stock left afterward.

With uncertain arrival dates, an emergency purchase from a faster supplier may prevent a shortage. It can also leave excess stock if the original shipment arrives soon afterward. A pair of independently calculated reorder points misses this interaction. The purchasing calculation must follow both orders through time, including the possibility that they arrive in the opposite order to that expected.

Every triggered order competes with other purchases

A retailer has $100 left to spend. A and B both cross their reorder points, with A ten units below its threshold and B one unit below. Each supplier requires a ten-unit lot costing $100. Ranking the requests by their distance below the threshold sends the money to A.

Suppose that, after existing stock is used, there is a 30% chance of selling all ten additional A units at $15 each, and otherwise none. For B, the chance is 80% at $20 each. Unsold units have no residual value; there are no further receipts or costs in this single selling period. Expected revenue is $45 for A and $160 for B. Buying A loses $55 in expectation; buying B earns $60; buying neither earns zero.

A is ten units below its reorder point, B only one. With a budget of 100 and a lot cost of 100, A loses 55 in expectation while B earns 60. Distance below a threshold gives the wrong purchasing priority.

D. Above: A is ten units below its trigger; B is one unit below. Below: expected revenue is compared with the purchase cost of 100. The boxes on the right show expected profit, after subtracting that cost. All amounts use the same currency. The probabilities concern sales of the additional lot, not service levels.

A passes the stock check and satisfies the supplier’s minimum order, yet loses money. Neither check compares what the two purchases can earn.

The same competition occurs in transport. After a busy weekend, many stores can cross their thresholds together, overwhelming warehouse picking or truck capacity. A few isolated orders can instead leave a truck too empty to justify the trip. Choosing what to ship requires comparing the cost of delaying some products with that of bringing others forward. The discussion of scarcity examines this problem with independent reorder points.

Validate forecasts and purchasing decisions separately

Pinball loss evaluates a quantile forecast at a specified probability. Use it to compare estimates of lead demand over the same horizon, using only information available at the forecast date. With linear shortage and surplus costs over one period, pinball loss is proportional to economic loss when the quantile probability is chosen from those costs.

At the same quantile, an unweighted sum gives a unit of forecast error the same weight across products. Yet a missing shirt and a missing aircraft part can have very different costs. Purchases also compete for cash and transport. There is no general conversion from a 1% improvement in pinball loss to a percentage reduction in stock.

Preserve dated snapshots of forecasts, stock, outstanding orders, and purchasing decisions. Evaluate subsequent demand and receipts, including long delays. Sales recorded during a stockout omit customers who could not buy; treating those sales as demand rewards understocking. A promotion or supplier failure may affect hundreds of SKUs together. Counting them as independent observations overstates the strength of the test.

Judge the purchasing policy by its costs and results: cash tied up, spoilage, freight, fulfilled demand, and losses from shortages. A historical replay estimates what a rejected purchase would have earned; it cannot observe that outcome. State the assumptions about demand and customer behavior. When a recommendation looks absurd, find which data, cost, or constraint made it attractive. Holimization uses these failures to revise how the business is modeled.

Explore the examples in Excel

Download: Reorder points and purchasing decisions. Four worksheets cover stock position, delivery timing, uncertain lead demand, and competing lots. Blue cells are editable inputs; green cells show results. Each sheet states its assumptions. The workbook contains formulas and charts, without macros or external workbook links.

Delay the first receipt from June 3 to June 8 to reproduce the backlog. Then reduce B’s selling price from $20 to $10: buying neither lot becomes the best choice, although both products remain below their reorder points.

Lokad’s approach

Lokad calculates what to buy, from whom, when, and where to send it. It compares the expected returns of those decisions under uncertain demand and supply, accounting for shared cash and capacity. The critique of safety stock applies to reorder points optimized one SKU at a time: each product is treated as if it had sole claim to those resources.

Some ERPs require Min/Max settings to generate replenishment orders. These fields can sometimes carry decisions calculated outside the ERP. Check its ordering calendar, rounding, and approval rules, then verify that the resulting orders match the intended purchases.