Deploying Lokad Without a Big Bang
Running two planning systems side by side can mean doing the planning work twice. If both need forecasts reviewed and orders adjusted, the trial competes for staff with the operation it is supposed to improve.
Lokad’s parallel run is practical because it generates decisions unattended, across the full agreed scope. The client continues its existing process, then authorizes Lokad’s decisions gradually, one store or category at a time. This parallel operation can last several months without staffing a second planning department.
The calculation covers every store. Authorization to use its decisions moves in stages.
Full scope before full adoption
Once the data pipeline and initial numerical recipe are ready, Lokad receives fresh extracts, typically every day, from the ERP, warehouse management system, CRM and other business systems. It produces the decisions covered by the project: replenishment quantities, production schedules, prices or allocations across a network.
For a retail replenishment project, the recipe calculates orders for every store in scope. Initially, the existing process continues to place the actual orders. Practitioners examine Lokad’s proposals, investigate surprises and explain what the recipe has misunderstood. Supply Chain Scientists revise the logic, and the next run applies it to fresh data across the network.
This exercises the data pipeline and recipe at production scale. Missing receipts, unusual supplier calendars and intermittent data failures can surface before orders depend on the new system. A trial confined to a few convenient products would leave much of this untested.
The client then approves decisions for a first store or category, expanding as the results warrant. The same recipe keeps calculating for the whole network, including stores still using the old process.
Each run uses the actual orders, stock reservations and movements recorded in the client’s systems, including those from the old process. It does not treat unapproved proposals as orders already placed.
Suppose two stores each need the last units in a warehouse. Evaluating either store alone could justify sending it all the available stock. The calculation must compare the economic consequences of shortages in both stores. Keeping the full network in view lets the client adopt gradually while accounting for competition over shared stock and capacity.
The parallel run tests whether data arrives reliably and proposed orders can be executed. Financial returns can be assessed from decisions the client actually adopts. I discuss this rollout in Bringing Automated Supply Chain Decisions to Production and in Introduction to Supply Chain.
What the client’s team does
IT sets up the scheduled data extracts and the controlled import of approved decisions into the systems that execute them. Both sending data to Lokad and returning orders to the ERP need an owner on the client’s side.
Practitioners explain the records and challenge the proposed decisions. A period without sales may mean no demand, no stock, or a product deliberately withdrawn. The people running the business help the scientists distinguish these cases. When a proposed order reveals an error, the scientists correct the recipe so that practitioners do not have to correct that error again each morning.
For a surprising order, the scientist should make its drivers visible: available stock, incoming orders, lead-time uncertainty, and the costs of buying more or running short. These explanations are generated with the decisions. Practitioners can dispute a specific assumption and see its effect on the proposed order.
Agreement with existing orders is a poor acceptance criterion: a system that copies them also copies their errors. The useful test is whether an unexpected decision can be explained economically and executed under real constraints.
Management and finance settle the economic assumptions: the cost of capital, the cost of poor service and the commitments that must be honored. They authorize which decisions to automate and when to start using them. The implementation overview describes the stages of this work.
Completing the takeover
Lokad’s scientists improve the recipe; they do not babysit individual forecasts. Practitioners test its decisions and explain what it has missed. This division of work makes a full-scale trial possible. Restricting the calculation to a small pilot would postpone discovering the problems elsewhere in the network until rollout.
As adoption progresses, the client can retire the old planning routine for each approved scope. Keeping it indefinitely, with Lokad supplying additional suggestions, would preserve both workloads. The parallel run should end with the daily decisions automated and the staff freed from producing them manually.